STIGNUSIndustrial Group
Projects

Evidence of execution under real conditions.

A selection of executed fronts. For confidentiality we do not show client names.

Paint booth line

Pressurized booths with technical mezzanine and integrated utilities for continuous production.

PaintingIntegration

Wastewater treatment plant

Physicochemical system tied to a paint line pretreatment.

ETEProcess water

Industrial dust collection

Collectors, ductwork and support structure for shot blasting.

DuctworkStructure

Large-scale steel structure

Structural erection with crane operations and controlled sequencing on site.

ErectionField

Process hall

Structure and enclosure to house process equipment and booths.

StructureConstruction

Application booth

Booth with access for large parts, installed in an operating plant.

PaintingRetrofit
How we work

What every project has in common.

Execution with real tolerances

Work starts when structures are no longer ideal; we keep progress moving with practical adaptation and technical judgment.

Interface control

Projects fail more from poorly controlled interfaces than from engineering. We coordinate suppliers and site constraints.

Function after handover

Success is measured when the system operates, not when the installation looks clean.

Your plant, your constraints.

Tell us the challenge and we'll evaluate it with you.